Do you need a city planning permit to build attic?

Verified 11 April 2024 - Directorate for Legal and Administrative Information (Prime Minister)

The city planning authorization is different if the attic of construction already constitute floor area or if work is required to create or add floor area.

Répondez aux questions successives et les réponses s’afficheront automatiquement

Awnings with already existing floor area

The attic of the construction have the following characteristics:

  • Ceiling height of more than1.80 m
  • Floor (or slab) resistant to the load of a human activity (housing, professional, craft, industrial, commercial)
  • A framework that does not clutter up the space

In this case, there is no authorization to apply for, because the floor area already exists.

However, if the dwelling is within the protective perimeter of a backup and enhancement plan, a Advance Work Statement (AD) must be tabled. To find out if the accommodation is located in this type of perimeter, you must contact the Departmental Unit of Architecture and Heritage (UDAP):

Warning  

The installation of a roof window imposes to deposit a DP in town hall.

Awnings with floor area to be created

The attic of the construction have the following characteristics:

  • Floor (or slab) that does not resist the load of a human activity (housing, professional, craft, industrial, commercial)
  • The framework that clutters the space

The existing area is considered non-upgradeable and does not constitute floor area.

If these criteria are changed to fit the attic, a floor area is created when the ceiling height exceeds 1.80 mr.

In this case, a Advance Work Statement (AD) must be deposited in town hall.

The means of compiling the RFP file differs depending on whether the project is located in Paris or in another municipality.

General case

The DP file must be filed in the City Hall:

  • By dematerialized according to the arrangements made by your municipality (inquire on the site of the town hall or on the spot)
  • By letter
  • In your own hand
On the Internet

The RFP application file can be completed on the Internet:

You should ask the city council or its website if it has an online service to complete the file.

Who shall I contact

Support for your city planning authorization request

Form

The RFP can be completed using a form:

The RFP form varies depending on the type of construction in which the attic is constructed.

For the attic of a detached house:

Prior declaration for a detached house and/or its annexes - DPMI

For the attic of another building:

Prior notification (construction, works, installations and facilities not subject to a building permit)

In Paris

The file must be submitted to the Basu: titleContent by dematerialized means only:

Office Accueil et Service à l'User (Basu) de Paris: one-stop-shop

Who can help me?

Find who can answer your questions in your region